Normally have a week's worth of information to share on my blog would not be that big of a deal. But this particular ten day period happens to be ripe with more fodder than usual. For all the doubters out there, we were able to finish the RV, sort of. You will have to follow subsequent posts to hear how everything turned out, but I am posting a few pictures to showcase the end of the week. We complete the framework and fully sealed the back of the RV on Friday, July 29th. Not as far as we wanted to get and a much longer day. We were 3 days late leaving for Mammoth and did not finally make it there until 3am Saturday morning. But we left knowing a major portion of the RV was done and Samoff was going to finish the rest. We now had two days to complete the forest service fire requirements for our mountain home.
When Chris and I first started dating we took a road trip to Oregon. On our way we were stopping off at his Mammoth house to do a "few" repair things and then we would continue on our leisurely road trip. It was a good thing the promise of the trip existed and that I had known Chris for quite awhile, otherwise this fix-up work might have been enough to scare me off for good. We repainted the outside of two sides of his house, rebuilt the framing around windows, sanded, dug, planted and generally did some massive physical labor for all the daylight hours three days in a row. Not all bad, but Chris does not like to stop for lunch or dinner, so I was a bit surly by the end of each day. Of course we made amazing progress and were both happy with the finished product. I dubbed the few days as "Hacker Work Camp" which was apparently my "dues" for getting to go on vacation. The rest of the vaca went extremely well with a Shakespeare Festival, White Water Rafting, Water skiing and jet boat riding so I decided Hacker work camp was worth it.
